Rowlands Gill Methodist Church
Kinetic have been hired by Gradon Architecture to carry out an M&E feasibility study and following that the detailed design work of the church’s refurbishment.
A new heating system is to be installed consisting of a mixture of underfloor heating and fixed panel radiators. The installation of a new toilet block will also introduce a ventilation system and revisions to the water and waste services.
The levelling of the internal floor levels throughout the property will see the small power services refreshed and the lighting replaced in most of the building.
Guisborough Town Hall
Guisborough Town Hall Kinetic Engineers are delighted to be working...
Read MoreRowlands Gill Methodist Church
Rowlands Gill Methodist Church Kinetic have been hired by Gradon...
Read MoreRoyal Birmingham Conservatoire
Royal Birmingham Conservatoire Royal Birmingham Conservatoire’s £57 million teaching and...
Read MoreThe People’s Theatre
The People’s Theatre is the home of The People’s Theatre...
Read More

Comments are closed