Farnham Medical Centre, South Shields

Kinetic were employed by Beaumont Brown to develop a detailed design for a minor refurbishment of the Farnham Medical Centre in South Shields.

The existing water and drainage systems were stripped out and replaced and new ventilation and split AC systems were installed. New emergency lighting and modifications to the fire detection system was also required.

Kinetic oversaw the tender and on-site installation to ensure everything ran smoothly in accordance with the client’s requirements.

Tags:

Comments are closed