Royal Birmingham Conservatoire

Royal Birmingham Conservatoire’s £57 million teaching and performance facility is the first of its kind in the digital age and is the perfect fusion of traditional and contemporary.

Featuring 9,000m2 of purpose-designed teaching, rehearsal and state of the art performance spaces, Kinetic Engineers Ltd were employed for the 18-month contract to design the project to RIBA Stage 7 – handover and close out. Our engineering team worked very closely with all key stakeholders and ensured the contractor was able to install the job from our working drawings. Kinetic Engineers Ltd produced a detailed calculations pack, plant schedules for procurement purposes, BWIC drawings, full technical support to the team and installation drawings for the contractor. On installation, we attended site to verify the equipment installed and produced an as installed EPC/SBEM for the final submission and completion certificate.

We were heavily engaged in the communications throughout the project between all parties. We attended site for inspections and we were eager in our approach to ensure the entire project ran smoothly. We received very positive feedback from the contractor who proceeded to employ us in future designs. 

Tags:

Comments are closed