Hungate Phase 2

Hungate Phase 2 is a new 193 apartment building, built over 5 storeys with a 78 space basement car park.

Kinetic Engineers was appointed by Castle Building Services to carry out a fully detailed Mechanical and Electrical services design.

The project includes the use of electric heating due to the high insulation values and low building air permeability and includes an array of photovoltaic panels located on the roof.

The project is due to be handed over before Christmas 2016.