Parkwood Primary School

The school required an upgrade to the existing staff, MI and repro room, which also include extending into the loft area to provide a mezzanine floor to house 2 offices and a community room. The works were all carried out during term time, thus all the services had to be designed and installed to minimise disruption to the educational calendar.

The extension into the loft also required proof that the window openings into the rooms met the natural ventilation criteria of Building Bulletin 101.

Tags:

Comments are closed